Energy

Energy

The team at GHA Livigunn have been supporting EDF across their existing fleet on numerous projects including chemical dosing, oxygen dosing, steam/condensate pipework, wash water systems and replacement of existing pipe work systems with HDPE . The team are SQEP to design seismically qualified structures and pipe work systems within the nuclear power sector too. Our team use leading FEA and Stress Analysis software to ensure the systems are operating within the requisite piping codes allowable limits.

Examples of case studies below

  • Heysham

    Heysham

    Heysham Reactor 8, Reactor Sea Water (RSW) pump pipework and by-pass pipework replacement British Energy / Boulting Nuclear £2.5m British Energy conditions for supply or repair and installation of plant (2005) 32 weeks Civil, Structural & Mechanical Engineering Design, Stress Analysis and Seismic Qualification Replacement of Reactor 8 RSW pipework and minus 9 RSW Quadrants and pipework with High Density Polyethylene (HDPE ). Bypass of existing damaged , buried, fibreglass more

  • Plymouth EfW

    Plymouth EfW

    Plymouth EfW (Energy from Waste) South West Devon Waste Partnership / MVV Environment Devonport Ltd £140m 34 months GHA Livigunn were appointed by Kier Construction Ltd as Lead Construction Designers for the Plymouth EfW facility. Currently in detailed design stage, the plant will deal with a nominal waste capacity of 245,000 tonnes per annum. The facility is located in the North Yard of Devonport Royal Naval Dockyard. The plant will divert 97% of the South West Devon Waste more

  • Power Station - Cooling water supply

    Power Station - Cooling water supply

    UK Based Power Station - Cooling water supply, pipe work replacement Boulting Group Plc £8m Professional Services Contract (Client Specific) 12 months Civil, Structural and Mechanical Engineering The purpose of the project was to replace the entire cast iron pipe work route from within the pump house across site through the turbine hall to the reactor building interface. This was achieved using HDPE pipe with sizes up to 630mm diameter over a distance of 472m. The existing pipe more

  • Torness

    Torness

    Torness Reactor 1 Reactor Sea Water (RSW) Pipework Replacement British Energy / Boulting Nuclear £850k British Energy conditions of contract for supply or repair and installation of plant (2005). 30 weeks Civil , Structural & Mechanical Engineering Design, Stress Analysis and Seismic Qualification Replacement of Reactor 1 RSW pump pipework and Minus 9 level distribution pipework for quadrants A, B, C & D in HDPE. Due to the aggressive nature of the sea water the more

 

Dynamic list image override

Insert an image in the editable area below to override the default image for this page in dynamic lists