Home Care Detergent Multi-Liquids Production Facility Major Blue-Chip FMCG Company £2m per plant Bespoke Client Contract and Confidentiality Agreement 8 weeks Complete Process, Mechanical, Electrical and Structural Design including Mass/Energy Balances, Heat Transfer and Hydraulic Calculations, Hazardous Area Classification to BS EN 60079, structural design of access and support steel, vessel design to PD5500, piping specifications, data sheets, P&IDs and Functional Design more

Liquids Bulk Storage Facility Major Blue - Chip FMCG Company € 2M Bespoke Client Contract 12 months Project Management & Full Process, Mechanical, Electrical and Civil / Structural Design The project was to provide additional offloading, bulk storage and delivery of new raw materials for a liquids processing plant. The three 60m 3 tanks were installed in a concrete bund and the liquids were transferred to the plant via a pipe-bridge. The new bund was designed for six tanks more

Stanlow Oil Refinery - Gas Conversion ESSAR £100k 9 months Process Engineering, Piping Design, Pipe Stress analysis, Civil/Structural design of support system GHA Livigunn’s role in the project is to design the natural gas feed system, from the supply point on the site natural gas system to their Medium Pressure Boiler plant, a distance of some 100 metres, and incorporating significant control changes to the boiler operations as well as pipework instrumentation design. more